The latest H12-425_V2.0-ENU Dumps are new updated to help you pass the HCIP-Data Center Facility Deployment V2.0 Exam. Passcert offers 100% verified HCIP-Data Center Facility Deployment V2.0 H12-425_V2.0-ENU Dumps to ensure your success in first attempt on high marks. It will give you a real exam scenario to show you the format of the actual exam. You will get to know your mistakes and then correct them to take your HCIP-Data Center Facility Deployment V2.0 exam confidently. These HCIP-Data Center Facility Deployment V2.0 H12-425_V2.0-ENU Dumps cover all the topics to help you understand the exam with ease and help you pass the H12-425_V2.0-ENU exam in one go with excellent marks.
HCIP-Data Center Facility Deployment V2.0 H12-425_V2.0-ENU Dumps

HCIP-Data Center Facility Deployment

Holding an HCIP-Data Center Facility Deployment certification, you will be able to have a basic command of Huawei modular data center solution, power distribution system solution, cooling system solution, and monitoring system solution, and be able to work as a pre-sales engineer, deployment and commissioning engineer, and solution engineer for data center infrastructure. It is recommended that you learn HCIA-Data Center Facility in advance.
Notice: HCIP-Data Center Facility Deployment V1.0 certification exam will be officially offline on June 30, 2021. Due to the increased difficulty of the HCIP-Data Center Facility Deployment V2.0 test questions, the passing score of the V2.0 written test has been adjusted from 750 points of the V1.0 written test to 600 points. The passing score of the V1.0 written test remains unchanged.

Huawei HCIP-Data Center Facility Deployment V2.0 Certification Exam

Exam Content

HCIP-Data Center Facility Deployment V2.0 mainly focuses on product technical features, installation and deployment, and parameter configuration, the product series includes the following products: Huawei modular data center Fusion Module series products, Huawei UPS and precision PDC series products, Huawei data center energy storage products, Huawei data center smart cooling products, and Huawei data center DCIM system products. Candidates need to be familiar with Huawei modular data center solution, power distribution system solution, cooling system solution, and monitoring system solution.

Knowledge Content

1.Introduction to Huawei Data Center Infrastructure   2%
2.Introduction to Modular Data Center Solution FusionModule2000 and 5000   5%
3.Introduction to Prefabricated All-in-One Data Center Solution FusionDC1000  3%
4.Introduction to Smart Mini and Small Data Center Solution FusionModule500 and 800  3%
5.Integrated UPS Introduction  3%
6.FusionModule2000 Installation  5%
7.Application of VRLA Batteries  3%
8.Huawei SmartLi Introduction, Installation, and Commissioning  3%
9.UPS2000 Product Introduction  3%
10.UPS2000 Installation  2%
11.UPS2000 LCD Operations and Commissioning  3%
12.UPS5000 Product Introduction  7%
13.UPS5000 Installation  2%
14.UPS5000 LCD Operations and Commissioning  8%
15.PDU8000 Modular PDF Introduction  3%
16.Introduction to Data Center Cooling Solutions  3%
17.Introduction to Huawei Air-Cooled Precision Air Conditioner  3%
18.Introduction to Huawei Chilled Water Precision Air Conditioners  3%
19.Introduction to the Huawei Modular Indirect Evaporative Cooling System  2%
20.NetCol5000-A042 Installation and Commissioning  9%
21.NetCol8000-C (070-260) Installation and Commissioning  3%
22.NetCol8000-E220 Installation and Commissioning  2%
23.ECC800-Pro Introduction  6%
24.Huawei DCIM Management Tool Introduction  6%
25.Huawei DCIM Product Introduction  8%

Share HCIP-Data Center Facility Deployment V2.0 H12-425_V2.0-ENU Sample Questions

When the UPS2000G battery status is NA, what could it be?
A. The battery is not connected
B. Battery Low Voltage
C. The battery connection is normal
D. The battery N line is not connected
Answer: A
What could be the cause of damage to the NETCOL5000-C insulation?
A. The fan noise is too loud
B. The drainage capacity of the equipment is significantly reduced
C. Pipeline condensation
D. The fan is blocked
Answer: C
What is the possible cause of the high discharge temperature of the NETCOL5000-A air conditioner compressor? (Multiple choice)
A. Refrigerant circuit or device blockage
B. The installation position of the outdoor unit is wrong
C. The condenser is dirty and blocked, resulting in poor heat dissipation
D. Too little refrigerant charge
Answer: ABCD
What are the possible reasons for the failure of the humidification function of the NETCOL5000-A air conditioner? (Multiple choice)
A. The indoor temperature is low
B. Humidifier damage
C. Humidifier circuit is not closed
D. The outdoor unit is not running
Answer: BCD
What are the factors that affect the service life of the battery? (Multiple choice)
A. Temperature
B. Cycle times
C. Depth of Discharge
D. Rated capacity
Answer: ABC
When the ECC800 detects that the connection signal to the device is interrupted, it will generate a communication interruption alarm. What are the possible reasons? (Multiple choice)
A. The power supply is abnormal
B. Loose cable connection
C. Poor cable contact
D. Equipment failure
Answer: ABCD
What can users do through the ECC800WEB interface? (Multiple choice)
A. Real-time monitoring of equipment status
B. Query version information
C. Export historical data
D. Software Upgrade
Answer: ABCD
What are the main components of the natural cooling source system? (Multiple choice)
A. Direct ventilation and natural cooling
B. Natural cooling by runner heat exchange
C. Natural cooling on the water side
D. Chilled water cooling scheme
Answer: ABC
What are the alarm management functions supported by the ECC800? (Multiple choice)
A. View historical alarms
B. Filter alerts
C. Alarm data export
D. Alarm parameter setting
Answer: ABCD
Which type of compressor is used in new room-level air cooling?
A. AC inverter compressor
B. Digital scroll compressor
C. Fixed frequency compressor
D. DC inverter compressor
Answer: B